Theory of Lost-Weight Scale:
During a circle T, the load vibrator works first and drives the materials into bucket, stops when weight reaches the target; then waits for stillness, then weighing. Second, Open the discharge gate and let materials out of the bucket; then waits stillness, then weighing again. Calculate and compare the target, compensate the error in the next circle.
DZT-Electromagnetic vibrator:
An adjustable feed device, suit for all kinds of materials.used for feed material into the equipments like belt onveyor,elevator, crusher etc.
Bucket Weighing Scale:
During a circle T, the load vibrator works first and drives the materials into bucket, stops when weight reaches the target; then waits for stillness, then weighing. Second, Open the discharge gate and let materials out of the bucket; then waits stillness, then weighing again. Calculate and compare the target, compensate the error in the next circle.
Output: 0.1-60t / h